Citrix
Expansion of 3 level long span garage to 5 levels.
Status : Complete
Scope
Provide General Contractor services for expansion of parking structure. Provide Architectural and Structural design and permit drawings. Provide structural retrofit and added structure as needed at existing garage levels to support the two additional levels. Include concrete work, demolition, glass/glazing panels, painting, striping/signage, elevator, MEP, fire sprinkler, sitework, grading & paving.
Elevated Decks : 2 Levels
Reinforcing Weight: 908,563 lbs
Volume of Concrete: 4,531 cy
Location : Santa Clara, Ca
Sq. Footage : 261,560 SqFt
Construction Duration: 12 Months
Owner: The Sobrato Organization
General Contractor: The Sobrato Organization
Architect: Form 4 Architects
Structural Engineer: FBA Engineers
Reinforcing Contractor : RJS & Associates. Inc.
Concrete Placer : RJS & Associates. Inc.
False Work Contractor : RJS & Associates. Inc.